on, McGraw-Hill Professional, 2005;
[3] PMI, A Guide to the Project Management Body of Knowledge, Third Edition, Project Management Institute, 2004;
[4] Glenn Ballard, The La st Planner System of Production Control, The thesis Submitted to the Faculty of Engineering of the University of Birmingham for the degree of Doctor of Philosophy, 2000;
[5] Koskela, L and Howell, G., The Underlying Theory of Project Management is Obsolete, The PMI Research Conference, 2002, Pg.293-302;
[6] SCL, Delay and Disruption Protocol, Society of Construction Law, 2002;
[7] AACE, Time Impact Analysis-A s Applied In Construction, AACE, Inc. 2006;
[8] AACE, Forensic Schedule Analysis, AACE, Inc. 2007;
[9] Keith Pickavance, Delay and Disruption in Construction Contracts, Second Edition, LLP Professional Publishing, 2002. 上一页 [1] [2] [3] [4] [5] [6]
|